Step Aside Lithium Project

8 km

North of Arcadia

35km

East of Harare

100 Hectares

Claim within the Harare Greenstone Belt

Q3 CY2022

Planned Drilling Date

The Step Aside Lithium Project is located 35km from Harare (and approximately 8km north of the Arcadia Lithium Mine Project). It comprises approximately 100 hectares of claim within the Harare Greenstone Belt.

The prospectivity of this area is confirmed by positive historical regional stream and soil sample geochemistry results. The potential is centred on four mineralised pegmatites that are mapped within a meta-dolerite host rock. These LCT mineralised pegmatites run parallel to each other in a north-south orientation and have dip angles of approximately 40-45˚ to the west.

An early-stage exploration program is underway at Step Aside, with rock chip sampling completed and trenching and drilling activities set to commence in Q3 2022. This work is targeted to determine potential extent by delineating the thickness and strike length of the sub-surface pegmatite.

Scroll to Top